The Proposed Building is B+G+M+7 Hotel building. The hotel is a 4-star hotel with 146 nos. of guest rooms.

Total Built-up Area: 16,919.84 Sqm

Time for completion = 24 months including mobilization.

Type of building =  RCC structure.

Dewatering, excavation, foundation by enabling contractor.

Client: Mr. Jurabek Safarov
Consultant: KPA Agostine Engineering Consultants